ext03thmb.jpg (8851 bytes)

Koss Residence
Web

ext11thmb.jpg (8113 bytes)


November 1999

Lot's of excavation work, the pool is dug and shored.

November 2, 1999

Bob's been doing the excavation work with a track hoe; he's amazing as you can see in this picture of him climbing out of the hole.

November 4, 1999

We started out with great weather....that was soon to change.

November 8, 1999

Lots of equipment on site for piles and drilling.

November 9, 1999

The rain is really starting to come down.  It's a battle keeping the site from becoming a muck pit.  Mike and crew are doing their best to filter runoff before it gets into the lake.

November 10, 1999

Visit from a neighbor - a muskrat?

November 11, 1999

Pool excavation and shoring.

November 16, 1999

Shoring from the deep end of the pool.

November 18, 1999

One section of shoring is left open for the construction of a trench drain.

The multi-picture panorama below shows the entire hole.  Click on it to see a larger (389 KB) image.

November 24, 1999

Welding additional steel behind shoring at deep end.