ext03thmb.jpg (8851 bytes)

Koss Residence
Web

ext11thmb.jpg (8113 bytes)


February 2000

We started pouring the walls around the media room.  The west wall is a test of the architectural concrete forms, ties, and control joint layout we'll be using for the exposed beam facing east.

February 8, 2000

Forming for the west pool-room wall in the distance.  Note that the forms have been stripped from the south-side of the media room wall.

February 8, 2000

Digging the utility trench (running from the street to the guest house location).

February 8, 2000

Guest house slab.

February 10, 2000

Excavated utility trench.

February 10, 2000

Pouring the west pool wall.

February 12, 2000

Media room walls.

February 12, 2000

Plenty of fun toys!

February 15, 2000

Panorama of media room and pool wall.

February 15, 2000

Architectural wall panel test.  Looks like we had a failure of the high density board (note the horizontal rippling, especially in the bottom panel).  We're planning on using HD board from a different supplier in a second test wall.

February 16, 2000

The media room floor - ready to pour the slab.

February 16, 2000

Schwing!.

February 16, 2000

Guest house framing begins!

February 18, 2000

February 18, 2000

Mechanical room takes shape.

February 18, 2000

Structural steel in on site.

February 18, 2000

Utility trench conduit.

February 22, 2000

Guest house framing proceeds quickly!

February 22, 2000

Big crane for steel erection.

February 22, 2000

These guys walk around on these steel girders like they were flat on the ground; but it's a 25 foot drop over the pool bottom.  You wouldn't want to fall from up there even with that safety line.

February 22, 2000

Erecting the steel.

February 23, 2000

February 25, 2000

Click on the panorama below for a full size version (100K).

February 25, 2000

The guest house loft takes shape.