Koss Residence
|
In March we got more concrete in place around the pool walls, guest house, garage slab, and under the study. The most visible progress was made in framing; the media room walls and ceiling got completely framed, and the first floor framing started to go up.
![]() |
March 8, 2000 Waterproofing installed around the exterior walls. |
![]() |
March 10, 2000 Electrical and plumbing conduit from the utility trench to the main house. |
![]() |
March 24, 2000 Looks like Lee is having fun moving material around the site. |
![]() |
March 15, 2000 Electrical and plumbing penetrations into the main house mechanical room. |
![]() |
March 15, 2000 Forms for the last of the media room walls. |
![]() |
March 21, 2000 Putting up walls in the media room. |
![]() |
March 24, 2000 Craning the dehumidifier into the mechanical room. |
![]() |
March 24, 2000 The guest house garage now serves as office as storage area. We're down to 2 trailers on the site. |
![]() |
March 24, 2000 Steel in the living room wall is craned into place and welded to vertical steel posts.
|
![]() |
|
|
March 24, 2000 Form at the east pool wall.
|
![]() |
March 24, 2000 Ceiling framing complete in the media room. The high area is under the dining room floor - the lower part is under the deck. |
![]() |
March 24, 2000 West end of media room. |
![]() |
March 24, 2000 Walls went up today on the first floor. This view is looking south through the living room wall. |
![]() |
March 24, 2000 Tip up of the wall at the front of the house stands 20' high. |
![]() |
March 24, 2000 The second monolithic wall on the main floor - extends through the stairwell from the basement through the second floor. |
![]() |
March 24, 2000 View across Cozy Cove to Rao's place. |
|
March 24, 2000 A stiched panorama of the water-side of the house. |
|
![]() |
|
![]() |
March 25, 2000 Framing for Kitchen (pantry and powder room layout visible on the floor). |
![]() |
March 25, 2000 Filling trench at front door. |
![]() |
March 28, 2000 Mike tests the load-bearing capacity of the library foundation walls. |
![]() |
March 31, 2000 Paul scares me - putting up scaffolding to build the front wall of the living room. |
![]() |
March 31, 2000 View from the dock - progress as of end of March. The Coles house is on the right. |
![]() |
March 31, 2000 Siding the garage. Front door is at the left side of this picture. |
![]() |
March 31, 2000 Looking down into the kitchen and entry hall. That's the pantry in the center of the picture. |
![]() |
March 31, 2000 Dining room (as seen from scaffolding). |