ext03thmb.jpg (8851 bytes)

Koss Residence
Web

ext11thmb.jpg (8113 bytes)


August 2000

Aerial survey, duct work, home automation wiring.

 August 2, 2000

J.R. helped me take some aerial pictures of the building site.   The picture below is taken from the north-east.

 

August 8, 2000

Our roofing panels arrive on the site.

August 10, 2000

The pool steel is primed and you can see waterproofing covering the outside east wall.

August 10, 2000

Study closet-window installed.

August 10, 2000

Front courtyard with waterproofing.

August 15, 2000

Ductwork in pool enclosure.

August 15, 2000

Kent, Mike, and Richard - figuring something out.

August 15, 2000

Ductwork in east pool wall.

August 29, 2000

Kayak tubes - encased in cement!

August 29, 2000

Wiring for HomeWorks (lighting control) panel.

August 29, 2000

Wiring bundles are showing up all over the house.  Here we have the beginnings of the "electrical closet" (behind the theater room), and the bundle for the master bedroom night stand(!).