August 2, 2000 J.R. helped me take some aerial pictures of the building site. The picture below is taken from the north-east. |
|
![]() |
|
![]() |
|
|
August 8, 2000 Our roofing panels arrive on the site. |
|
|
August 10, 2000 The pool steel is primed and you can see waterproofing covering the outside east wall. |
|
|
August 10, 2000 Study closet-window installed. |
|
|
August 10, 2000 Front courtyard with waterproofing. |
|
|
August 15, 2000 Ductwork in pool enclosure. |
|
|
August 15, 2000 Kent, Mike, and Richard - figuring something out. |
|
|
August 15, 2000 Ductwork in east pool wall. |
|
|
August 29, 2000 Kayak tubes - encased in cement! |
|
|
August 29, 2000 Wiring for HomeWorks (lighting control) panel. |
|
|
August 29, 2000 Wiring bundles are showing up all over the house. Here we have the beginnings of the "electrical closet" (behind the theater room), and the bundle for the master bedroom night stand(!). |
|