Koss Residence
|
Lakefront retaining wall, lawn, courtyard wall, pool ceiling steel, pool windows.
|
September 6, 2000 We're constructing a stone retaining wall down by the water. Note the Kayak storage tube at the far right. |
|
|
September 8, 2000 We're creating a concrete block wall around the front courtyard. This will be covered in the same stucco as the house. |
|
![]() |
September 8, 2000 Bluestone pavers arrive at waterfront. |
|
September 8, 2000 Waterfront wall under construction. |
|
|
September 8, 2000 A stormy day at the dock. |
|
|
September 12, 2000 Construction of the fire pit. |
|
![]() |
September 14, 2000 Topsoil for the "front" lawn. |
|
September 19, 2000 Sandblasting the walkway steel in preparation for painting. |
|
|
September 21, 2000 Work progresses next door. |
|
|
September 28, 2000 Preparation of a wall section for a stucco mock-up (we're using a discarded - "wrong" - window to show the window details). |
|
|
September 28, 2000 This gorgeous(!) material arrives for the walkway beams. |
|
|
September 29, 2000 Installation of pool room windows begins. |
|