Lakefront retaining wall, lawn, courtyard wall, pool ceiling steel, pool windows.

September 6, 2000

We're constructing a stone retaining wall down by the water.  Note the Kayak storage tube at the far right.

September 8, 2000

We're creating a concrete block wall around the front courtyard.  This will be covered in the same stucco as the house.

September 8, 2000

Bluestone pavers arrive at waterfront.

September 8, 2000

Waterfront wall under construction.

September 8, 2000

A stormy day at the dock.

September 12, 2000

Construction of the fire pit.

September 14, 2000

Topsoil for the "front" lawn.

September 19, 2000

Sandblasting the walkway steel in preparation for painting.

September 21, 2000

Work progresses next door.

September 28, 2000

Preparation of a wall section for a stucco mock-up (we're using a discarded - "wrong" - window to show the window details).

September 28, 2000

This gorgeous(!) material arrives for the walkway beams.

September 29, 2000

Installation of pool room windows begins.