ext03thmb.jpg (8851 bytes)

Koss Residence
Web

ext11thmb.jpg (8113 bytes)


February 2001

Pool roof and finishes.

February 3, 2001

Installing the Hardi-Plank on the ceiling of the pool room.

February 3, 2001

The house is beginning to look nearly finished with final stucco color and nearly complete cedar siding.

February 3, 2001

The QuadWall roofing panels and assembly parts finally arrive (after being delayed by a factory fire).

February 3, 2001

The courtyard wall is tarped over in preparation for stucco application.

February 13, 2000

Our interior doors are set up to be prepped in the dining room.

February 13, 2001

Painted out speaker grills on the deck really blend in well with the stucco walls.

February 13, 2001

Placing stone edging around the courtyard.

February 14, 2001

Stucco application on the concrete courtyard wall.

February 15, 2001

Pool QuadWall roof installation.

February 15, 2001

Hard-plank boards outside the pool room deck.  The ceiling pattern is the same inside and outside.

February 15, 2001

...even under the stairs!

February 15, 2001

Stone detail - bathroom floor tile.

February 16, 2001

We get a big snowfall in Seattle (pictures from Bothell).

February 18, 2001

San Diego Zoo....

February 27, 2001

The concrete drive is demolished.

February 27, 2001

QuadWall roof installation complete.

February 27, 2001

Wiring the electrical "closet" behind the media room.