Pool roof and finishes.
|
February 3, 2001 Installing the Hardi-Plank on the ceiling of the pool room. |
|
|
February 3, 2001 The house is beginning to look nearly finished with final stucco color and nearly complete cedar siding. |
|
|
February 3, 2001 The QuadWall roofing panels and assembly parts finally arrive (after being delayed by a factory fire). |
|
|
February 3, 2001 The courtyard wall is tarped over in preparation for stucco application. |
|
|
February 13, 2000 Our interior doors are set up to be prepped in the dining room. |
|
|
February 13, 2001 Painted out speaker grills on the deck really blend in well with the stucco walls. |
|
|
February 13, 2001 Placing stone edging around the courtyard. |
|
|
February 14, 2001 Stucco application on the concrete courtyard wall. |
|
|
February 15, 2001 Pool QuadWall roof installation. |
|
|
February 15, 2001 Hard-plank boards outside the pool room deck. The ceiling pattern is the same inside and outside. |
|
|
February 15, 2001 ...even under the stairs! |
|
|
February 15, 2001 Stone detail - bathroom floor tile. |
|
|
February 16, 2001 We get a big snowfall in Seattle (pictures from Bothell). |
|
|
February 18, 2001 San Diego Zoo.... |
|
|
February 27, 2001 The concrete drive is demolished. |
|
|
February 27, 2001 QuadWall roof installation complete. |
|
|
February 27, 2001 Wiring the electrical "closet" behind the media room. |
|