Pool tile and stone, flooring, driveway.
|
March 6, 2001 Driveway island. |
|
|
March 8, 2001 Tiling the pool begins. |
|
|
March 11, 2001 Office bookshelves. |
|
|
March 11, 2001 More door preparation (in living room - looking down from bridge). |
|
|
March 11, 2001 Hinged ceiling panel for media room projector. |
|
|
March 11, 2001 Music room floor. |
|
|
March 11, 2001 Fireplace detail from pool room - doesn't look symmetrical to me. |
|
|
March 11, 2001 West wall of pool room. |
|
![]() |
March 11, 2001 East wall of pool room - DiveCam replay display enclosure. |
|
March 11, 2001 Pool tile grout samples. We like the middle one (Grey Mist) for the pool tile. |
|
|
March 11, 2001 Pool west wall - stone tile. |
|
|
March 11, 2001 Lots of progress tiling pool. |
|
|
March 11, 2001 Wonderful workmanship in wiring the electrical closet. |
|
|
March 11, 2001 Front courtyard. |
|
|
March 11, 2001
|
|
|
March 13, 2001 Basalt crystals at the guest-house garden. |
|
|
March 13, 2001 Rain chute "in-action"! |
|
![]() |
March 14, 2001 Pool wall in progress. |
![]() |
March 17, 2001 Auto-court concrete. |
![]() |
March 17, 2001 Debbie (as seen from "dive-door"). |
![]() |
March 17, 2001 View from dive-door. |
![]() |
March 17, 2001 Pool water feature. |
![]() |
March 17, 2001 What IS this stuff? Looks like it's trying to escape it's container. |
![]() |
March 17, 2001 Electronics racks in place. |
![]() |
March 17, 2001 Water feature in action. |
![]() |
March 20, 2001 Pool wall with grout in place. |
![]() |
March 20, 2001 Rowing shell in need of rescue. |
![]() |
March 20, 2001 Mike Flohr with his creation! |
![]() |
March 20 , 2001 Bench installation. |
![]() |
March 22, 2001 Pool room gets painted. Note dive door with solid aluminum dive "platform" at right. |
![]() |
March 22, 2001 Main stairway suspended lighting. |
|
March 27, 2001 Cedar benches around the fire pit. |
|
![]() |
March 27, 2001 Grading the driveway. |
![]() |
March 30, 2001 Preparation for boathouse repair. |