Pool tile and stone, flooring, driveway.

March 6, 2001

Driveway island.

March 8, 2001

Tiling the pool begins.

March 11, 2001

Office bookshelves.

March 11, 2001

More door preparation (in living room - looking down from bridge).

March 11, 2001

Hinged ceiling panel for media room projector.

March 11, 2001

Music room floor.

March 11, 2001

Fireplace detail from pool room - doesn't look symmetrical to me.

March 11, 2001

West wall of pool room.

March 11, 2001

East wall of pool room - DiveCam replay display enclosure.

March 11, 2001

Pool tile grout samples.  We like the middle one (Grey Mist) for the pool tile.

March 11, 2001

Pool west wall - stone tile.

March 11, 2001

Lots of progress tiling pool.

March 11, 2001

Wonderful workmanship in wiring the electrical closet.

March 11, 2001

Front courtyard.

March 11, 2001

 

March 13, 2001

Basalt crystals at the guest-house garden.

March 13, 2001

Rain chute "in-action"!

March 14, 2001

Pool wall in progress.

March 17, 2001

Auto-court concrete.

March 17, 2001

Debbie (as seen from "dive-door").

March 17, 2001

View from dive-door.

March 17, 2001

Pool water feature.

March 17, 2001

What IS this stuff?  Looks like it's trying to escape it's container.

March 17, 2001

Electronics racks in place.

March 17, 2001

Water feature in action.

March 20, 2001

Pool wall with grout in place.

March 20, 2001

Rowing shell in need of rescue.

March 20, 2001

Mike Flohr with his creation!

March 20 , 2001

Bench installation.

March 22, 2001

Pool room gets painted.  Note dive door with solid aluminum dive "platform" at right.

March 22, 2001

Main stairway suspended lighting.

March 27, 2001

Cedar benches around the fire pit.

March 27, 2001

Grading the driveway.

March 30, 2001

Preparation for boathouse repair.